Yinsong Canal (Songhua-to-Chagan Lake Diversion)

The Yinsong project is a major local waterworks route, not just a line on a map. Built over eight years, its 53.85-kilometre channel uses a natural elevation drop rather than pumping stations. Government accounts describe thousands of workers shaping the route by hand, after which the water system helped change access to irrigation in a county with a history of saline land and marshy low ground. This feature follows the canal as an engineered connection among river, lake, marsh and field, while keeping reported before-and-after agricultural statistics tied to their original dates.

Stories from This Place