A steep river valley can make two neighboring settlements feel far apart. In a 2021 report on Fugong, a resident recalled that people once crossed the Nu River by zip-line or walked more than ten kilometres, spending seven or eight hours on mountain paths to reach a bridge. The obstacle was woven into daily routines: how to reach a field, take produce to market, visit relatives or reach a health service on the opposite bank.
The same report follows bridges at the scale of everyday work. After the Munima Bridge opened, one resident said she could reach an orchard and tea garden on the far bank in minutes rather than taking a long detour. The report describes 50 bridges built in Fugong as part of a larger road network. These were not all identical structures or all used for the same purpose; together, they made a series of local crossings that connected village roads to fields and services.